The River House

The most beautiful lake on earth

Site Navigation[Skip]

  • Home Page
  • Original condition
  • Site Cleanup
  • River Repairs
  • The Crew
  • Floorplans
  • 2009 Construction
  • Mike and Salli's House
  • Rental Properties

April 16-April 22, 2009

Previous
Next
List

Slab reinforcing installed, slab poured and building walls were started. The entry wall was started and we moved a few trees.

Finishing

Finishing

Install maya

Install maya

Slab electrical

Slab electrical

Plumbing the bath

Plumbing the bath

Slab watering

Slab watering

First slab section

First slab section

First slab II

First slab II

Bringing in supplies #20

Bringing in supplies #20

Starting the door walls

Starting the door walls

Continuing conference

Continuing conference

Entry wall footing

Entry wall footing

Conference #17

Conference #17

Southeast wall

Southeast wall

Road work

Road work

Moving the pony palm

Moving the pony palm

Water and electrical mains

Water and electrical mains

[Back To Top]